| Date: |
1-18-2016 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Prep side skins (23-06) |
|
|
After drilling the longeron holes I pulled all the parts off and prepped the side skins for riveting. I also trimmed of the trail edge per the directions, where it was just used as a template to drill the angled section of the longeron. Dremmel with cut-off saw works well for this, then follow up with the file to smooth out. I can get a -pretty straight cut with the dremmel. |
||