| Date: |
6-25-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Installed retainer blocks (20-02) |
|
|
Primed and prepped the side bulkhead and final drilled the # 11 holes as instructed. I torqued the bolts to about 25 in-lbs over the running torque, and then applied torque seal. |
||