Date:    6-15-2015
Number of Hours:    2.00
Brief Description:    Finish up right flaperon (18-06)
Finished up the right flaperon and all the skins and rod ends installed. I still have a couple things left on the wings, the light extensions and the lift wing still needs the Service Bulletin. I think I'll wait until Oshkosh to get a look at some wing tip work examples.