| Date: |
8-23-2014 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Match drill rib doubler and prep brackets (13-02) |
|
|
Spent many hours deburring the angle brackets. It's been super-hot and humid out in the garage, so I opted to side inside and deburr in the A/C. On one occasion it was 102 F in the garage...way too hot to work for very long. I also match drilled the rib doubler and the long #30 drill bit with small drill worked great. |
||