Date:    9-2-2006
Number of Hours:    8.00
Brief Description:    SIDE SKINS
MATCH DRILLED LEFT F823PP SIDE SKIN TO LONGERONS AND OTHER STRUCTURE. MATCH DRILLED F805 AND F806 LEFT BULKHEADS. CUT AND STARTED FITTING MID AND LOWER LONGERONS.