Date:    8-19-2006
Number of Hours:    8.00
Brief Description:    SIDE SKINS
DRILLED LEFT SIDE FRONT F820PP SKIN TO LONGERONS AND F804 BULKHEAD. STARTED ON RIGHT SIDE. TAKES A LOT OF TIME TO GET EVERYTHING CENTERED AND MATCHED.