Date:
8-31-2006
Number of Hours:
4.00
Brief Description:
SIDE SKIN
MATCH DRILLED RIGHT F823PP SKIN TO LONGERON AND OTHER STRUCTURE. MATCH DRILLED F805 AND F806 BULKHEADS TO F823PP RIGHT SKIN.