Date:    7-8-2013
Number of Hours:    0.70
Brief Description:    Preparing the Main Spars (LH&RH)
Clamped the W-731 and W-726 spacers to the spar and slipped a bolt through the reference hole previously made at the dimensions shown and the spar, Used painter's tape to hold the spacers in place while aligning and match-drilling the AEX bars.