Date:    6-13-2013
Number of Hours:    0.70
Brief Description:    Preparing the Main Spars (LH&RH)
Attached the two K1000-4 center section attach platenuts to the FWD side of the spar. Countersunk the W-706C doubler plate to allow the flush heads of the rivets to rest on the aft side of the spar.