| Date: |
9-13-2012 |
|
| Number of Hours: |
1.20 |
|
| Brief Description: |
Riveting the Left Elevator |
|
|
Riveted E-610PP, E-611PP, and platenuts to E-702. Riveted E-705 to E-702, noting the flush heads fwd. Riveted WD-605-1-L Elevator Horn to E-702 Elevator Spar and E-705 Root Rib. Detail-Primed minor scratches |
||