| Date: |
8-20-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Completing Rudder Leading Edge |
|
|
Rudder leading edge formed by using a 3/4" conduit pipe along the rudder leading edge overhanging skins. Conduit pipe was marked lenghtwise with sharpie and attached to the skin with duck tape, then it was rolled up and in using vise grips. Leading edge riveted together using blind (pop) rivets. Installed rod end bearings to rudder spar. |
||