Date:    3-23-2012
Number of Hours:    1.60
Brief Description:    Drilling the Horizontal Stabilizer (LH)
Marked location of rivet holes on HS-404 and HS-405 ribs using HS-801PP as a guide.
Flutted HS-404 and HS-405 between hole marks.
Marked a centerline on HS-404 and HS-405 top and bottom flanges.
Aligned and clamped centerline of HS-404 and HS-405 flanges with rivet holes in to HS-801PP skin.
Drilled and clecoed aft flange of HS-405 rib to HS-603 spar, using HS-603 hole as drill guide.
Uninstalled pieces and cleaned out chips.
Reinstalled HS-405 rib to HS-801PP skin.