Date:    3-22-2012
Number of Hours:    2.90
Brief Description:    Drilling the Horizontal Stabilizer (LH)
Marked all ribs RIGHT SIDE (RH)/LEFT SIDE (LH). Chose LH HS-702,HS-603PP, HS-706, HS-707, HS-708 to work with.
Clecoed all pieces together.
Drilled all rib-to-spar attach holes to #30 (except HS-708 to HS-603PP holes as per instructions).
Un-cleacoed, deburred edges, holes and surfaces, and cleaned out chips of every LH piece.
Re-clecoed assembly back together.
Clecoed on the HS-801PP skin.