| Date: |
1-10-2019 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Flaps (RH) |
|
|
10/01/19: put together RH flap assembly for labeling of parts and began match-drilling. Installed the AN257-P3 piano hinge to bottom flange of spar and skin and match-drilled the holes. |
||