| Date: |
1-12-2016 |
|
| Number of Hours: |
0.70 |
|
| Brief Description: |
Wire, Switches, Fuses, and Connectors (RH) |
|
|
Worked on electrical wiring in RH wing. Drilled holes and installed nylon adel clamps to outboardmost RH LE rib to hold Duckworks HID LE Landing Light ballast wires: Drilled two #19 holes 1.0" inboard from LE skin and 1.0" distance (front hole) from stiffening crease and (aft hole) from main front spar. Used rivets to secure nylon adel clamps in place. |
||