| Date: |
8-20-2015 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Assembling and Sealing the Tank (RH) |
|
|
Finished wet riveting RH tank stiffeners. Wet riveted and sealed filler neck flange and encapsuled set rivets afterward. Encapsulated inside set rivets in fuel drain valve |
||