| Date: |
8-19-2015 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Assembling and Sealing the Tank (RH) |
|
|
Scuffed all LH mating surfaces of stiffeners, filler neck and fuel drain valve for better Proseal adhesion. Clecoed all pieces mentioned above with Proseal. Fay sealed RH fuel filler neck. |
||