| Date: |
2-17-2016 |
|
| Number of Hours: |
1.30 |
|
| Brief Description: |
Ailerons (LH) |
|
|
Match-drilled the A-408 LH aileron spar reinforcement brackets. Located and drilled to #12 holes for AN3 attach bolts. Deburred all drilled holes. |
||