| Date: |
10-26-2014 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Assembling and Sealing the Tank (RH) |
|
|
Wet-riveted the flop tube's anti-rotation bracket to inboard ribs and left to dry. Installed, torqued, and prosealed AN833-6F bulkhead fitting ell elbow for flop tube to 120lb/in. Covered fitting with proseal. |
||