Date:    10-26-2014
Number of Hours:    1.50
Brief Description:    Assembling and Sealing the Tank (RH)
Wet-riveted the flop tube's anti-rotation bracket to inboard ribs and left to dry.

Installed, torqued, and prosealed AN833-6F bulkhead fitting ell elbow for flop tube to 120lb/in. Covered fitting with proseal.