Date:    6-5-2014
Number of Hours:    1.50
Brief Description:    Assembling and Sealing the Tank (LH)
Fay installed stiffeners by first spreading a thin layer of sealant to the inside of the skin at the stiffener position, as well as over the contact surface of the stiffeners.
Installed with 100% clecos until sealant dried.
Fabricated Fuel Vent Line for LH tank.