| Date: |
9-24-2014 |
|
| Number of Hours: |
0.60 |
|
| Brief Description: |
Fuel Tank Final Preparations (RH) |
|
|
Centered the VA-112 drain flange on the prepunched hole in skin and match-drilled fuel tank skin drain hole using holes in flange as guide. Deburred holes in flange and skin. |
||