| Date: |
6-12-2014 |
|
| Number of Hours: |
3.60 |
|
| Brief Description: |
Assembling and Sealing the Tank (LH) |
|
|
Riveted with proseal and encapsulated each rivet of Tank's inner ribs. Riveted with proseal flop tube anti-hangup bracket guide to inboardmost rib access hole to avoid from getting caught in the nutplates. |
||