| Date: |
6-10-2014 |
|
| Number of Hours: |
3.70 |
|
| Brief Description: |
Assembling and Sealing the Tank (LH) |
|
|
Fay sealed all inner ribs and held with 100% clecos. Fabricated flop tupe anti-hangup guide out of .030" 5/8" wide aluminum strip as shown in DWG 16A. Drilled holes and clecoed in position for proseal. |
||