| Date: |
6-4-2014 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Assembling and Sealing the Tank (LH) |
|
|
Installed, torqued, and prosealed AN833-6F bulkhead fitting ell elbow for flop tube to 120lb/in. Covered fitting with proseal. Installed and prosealed fuel drain flange. |
||