Date:    5-27-2014
Number of Hours:    1.70
Brief Description:    Fitting the Tank Skin to Ribs and Baffle (LH&RH)
Worked between Mar. 05 and May 27:
Fabricated the LH & RH T-405 tank attach angles and pre drilled them with the rivet holes callout per DWG 16A