| Date: |
5-27-2014 |
|
| Number of Hours: |
1.70 |
|
| Brief Description: |
Fitting the Tank Skin to Ribs and Baffle (LH&RH) |
|
|
Worked between Mar. 05 and May 27: Fabricated the LH & RH T-405 tank attach angles and pre drilled them with the rivet holes callout per DWG 16A |
||