Date:    11-6-2013
Number of Hours:    0.50
Brief Description:    Fitting the Leading Edge (LH)
Removed the vinyl from the inside surface of the W-701 LH Leading Edge Skin.
Placed skin in the cradle made out of composite wood and clecoed the Leading Edge together.
Placed LH Leading Edge assembly on Main Spar and match-drilled all holes on ribs, spar and LE skin using LE skin as guide.