| Date: |
7-1-2012 |
|
| Number of Hours: |
2.60 |
|
| Brief Description: |
Drilling the Vertical Stabilizer |
|
|
Removed outter blue protective vinyl stripes over holes using solderin iron from VS-801PP skin. Removed inner blue protective vinyl from VS-801PP skin. Clecoed VS-801PP skin to empennage skeleton Drilled & Match-drilled #40 all attaching holes from VS-801PP skin to skeleton. Marked drilled holes with green Sharpie. Reduced little flange edge excess protuding out of skin and left it flush with VS-801PP skin's edge. Marked location and orientation of VS-808PP spar doubler, VS-803PP spar, VS-410PP, VS-411PP, and VS-412PP hinge bracket pairs. Disassembled everything. |
||