Date:    3-31-2018
Number of Hours:    2.00
Brief Description:    Dry run for front and rear spar join.
Just a dry run and detailed inventory for the parts required to join the two front spar halves and the two rear spar halves. Found some missing pieces that I need to track down before taking on this task.