| Date: |
7-5-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Seat belt and electrical |
|
|
Today I spent some time sanding down the aft hardpoints for the seatbelts and making the forward hardpoints. Waiting on some stuff from Aircrafty Spruce so I can lay down some S glass strips and set the points in place. I also secured the positive bat passthrough and added the negative which doubles as a ground point for the airframe. |
||