Date:    6-6-2006
Number of Hours:    1.75
Brief Description:    Installed conduit and floors
My conduit showed up yesterday so first order of business was to get it installed. I ended up using a 1 3/8" unibit all the way through the 1 3/8" step to open up holes for the conduit. Once run, I used some E6000 in strategic places to keep the conduit from squirming around. I also got the baggage floors riveted in with the exception of the nutplates.