| Date: |
6-6-2006 |
|
| Number of Hours: |
1.75 |
|
| Brief Description: |
Installed conduit and floors |
|
|
My conduit showed up yesterday so first order of business was to get it installed. I ended up using a 1 3/8" unibit all the way through the 1 3/8" step to open up holes for the conduit. Once run, I used some E6000 in strategic places to keep the conduit from squirming around. I also got the baggage floors riveted in with the exception of the nutplates. |
||