| Date: |
2-26-2016 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Cowl |
|
|
Sanded inside of cowl and layed in raw epoxy coat. Installed dip stick with light rtv coat on both sides of gasket. Installed heat muff. Started on gear leg fairings. |
||