| Date: |
8-12-2016 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Final Assembly |
|
|
Mark Kenney and Matt Tromifichuck helped me with final assembly. Installed and torqued wingbolts. Vent lines. Fuel lines. Secured fuel tank wiring. Installed flaps, ailerons, push tubes. Inspected tail. Installed wingtips. |
||