| Date: |
9-27-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Started static |
|
|
Started out with intentions of fabing and installing f-782d bracket that supports a spar cover. I really need to have the gussets in place. Moved onto the static ports. Drilled static port holes. Primed ports. I need a second set of hands to dimple and install. |
||