| Date: |
1-2-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
New connector for elevator trim servo |
|
|
I cutoff the old connector from the elevator trim servo and crimped on d-sub conncectors that will be covered with heat shrink |
||