| Date: |
3-1-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Fabricate cowl flap mechanism |
|
|
Filed and sanded the flap mechanism assembly, then applied a coat of primer. Came up with a means of holding the back-rivet steel plate against the firewall (engine side) and was able to back rivet the flap backing plates from the inside of the cabin using the back-rivet set on the rivet gun. Sure like the results of back-riveting!!! |
||