Date:    2-3-2009
Number of Hours:    5.00
Brief Description:    Fitting the cowl
Fabricated the left and right side horizontal fasterner strips that will be attached to the lower cowl. Match-drilled the fastener to the cowl and counter-sunk the holes (in the fiberglass). Rivets will be installed tomorrow. No pictures today.