| Date: |
6-1-2008 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Pitot, AOA and Static lines |
|
|
With the panel out of the fuselage, fabricated the lines that connect both Dynon's as well as the TruTrak AutoPilot. The AOA line is specific to the Dynon's; however, the Pitot and Static lines need to feed the AP also. Ran the Pitot and AOA lines down the firewall and through the center section where they take a left out to the wing root. |
||