Date:    5-10-2008
Number of Hours:    7.00
Brief Description:    Control stick and push tubes
Worked on the Control stick adjustment and installation of the push tubes for the Elevators. It took some time to get things lined up correctly. Attached the Elevator servo also. Began the wiring for the PTT for both sticks and for the Flap control. Managed to get most of the local wiring for the pilot stick complete. No pictures today.