| Date: |
9-16-2007 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Aft Canopy latch |
|
|
Marked and drilled the C-611 block for the vertical position of the bolts. Drilled the holes then enlarged them with a #10 drill bit. Installed the VS-411 brackets and links and fabricated the C-710 push rod. Tested everything for fit. |
||