| Date: |
2-10-2008 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Primary wiring forward of firewall |
|
|
Added strain relief to the numerous cables between the panel and the Aproach FastStach Hub. Drilled through the firewall and mounted the ground block with two 5/16 inch bolts. Ran a #6 AWG ground wire from the batteries forward and attached to the block. Drilled a couple of small holes below for clamps for strain relief on the firewall side. Fabrictated two #6 AWG ground straps and secured to each side of the engine block. Ran and attached the #6 AWG wire for the Primary Power bus. |
||