| Date: |
6-7-2009 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Aileron work |
|
|
AOA and Ptiot connections done in the cabin. Installed the push-tubes to the control assembly in the cabin and also in the wings. Installed the right stick. Travis and Darren arrived from Santa Cruz. |
||