Date:    5-12-2007
Number of Hours:    1.00
Brief Description:    Cabin Frame
Began construction of the Cabin frame today. Didn't do much, but at least cut the access holes in the aft F-631A channel using a hole saw in the drill press. Also fabricated the F-631E plates.