| Date: |
5-12-2007 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Cabin Frame |
|
|
Began construction of the Cabin frame today. Didn't do much, but at least cut the access holes in the aft F-631A channel using a hole saw in the drill press. Also fabricated the F-631E plates. |
||