| Date: |
11-27-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Step kit, left side |
|
|
Spent several hours working on the placement and fit of the left side step. Made sure that the forward vertical edge of the mount was parallel to the F-724 vertical rib. Also located the second vertical row of rivets in a position that passed through the F-724 flange and that the rivet holes missed any existing rivets in F-724. |
||