| Date: |
11-18-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
F-635 Bell Crank |
|
|
Riveted the F-728B angle to the F-728A vertical channel. Completed the fabrication of the F-635 bellcrank (some fabrication on this done months ago). Fabricated the F-635C tubular spacers. Squared the ends of the spacers in the drill press onto a flat file clamped to the drill press table. Removed the assembly and set aside for later installation. |
||