Date:    11-18-2006
Number of Hours:    3.00
Brief Description:    F-635 Bell Crank
Riveted the F-728B angle to the F-728A vertical channel. Completed the fabrication of the F-635 bellcrank (some fabrication on this done months ago). Fabricated the F-635C tubular spacers. Squared the ends of the spacers in the drill press onto a flat file clamped to the drill press table. Removed the assembly and set aside for later installation.