| Date: |
10-7-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Forward fuselage - preparation |
|
|
Drilled the center floor stiffeners to the F-601J angles on the firewall. Worked on the baggage area F-724 and F-722 ribs. Drilled the top and bottom flanges of the F-724 to the longeron and F-623 rib. |
||