| Date: |
6-8-2006 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Aft Bulkheads - fab & assembly for F-706 |
|
|
Began fabrication of the various attach angles for the F-706 Bulkhead. Not too difficult, just time-consuming. I have chosen to drill the optional 5/8" hole for wiring (not shown). There are a few other holes to drill for the manual trim, the rudder cables and the static vent line. All-in-all, fairly simple work. |
||