| Date: |
2-19-2007 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Fitting the Vertical Stabilizer |
|
|
Riveted the F-781 plate to the VS. Riveted the F-712D to the fuselage. Drilled the front spar to the F-781 and bolted the VS to the HS and the rear bulkhead. |
||