| Date: |
3-14-2006 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Elevator match drilling |
|
|
Between long work days and the Kings VS Lakers game tonight, there was not much time left to work on the RV. Match-drilled the right Elevator stiffeners to the top and bottom skins. Match-drilled the rudder stiffeners to the left Elevator skin. More Elevator prep-work to come. |
||