| Date: |
11-30-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Re-assemble panel |
|
|
With the labeling complete, it's time to re-assemble the panel in the aircraft. Cut to length and installed the fresh air vent hose. Installed all of the avionics and tested for operation (as best as can be done on the ground.) |
||