| Date: |
3-19-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Center Console |
|
|
Finished drilling to A5 on center arm rest. Prep and Zinc all "L" 's for center arm rest. (which doubles as a tunnel for torque tube) Also a path for elevator cables and rudder cables. Removed seat back to rivet side braces that can not be riveted after installed. Have re-installed seat back. (This was a bear! ) As expected, I need to rivet a few things on fuse. that can't be done later. (Lots to rivet from bottom of plane. |
||