Date:    3-19-2008
Number of Hours:    4.00
Brief Description:    Center Console
Finished drilling to A5 on center arm rest.

Prep and Zinc all "L" 's for center arm rest. (which doubles as a tunnel for torque tube) Also a path for elevator cables and rudder cables.

Removed seat back to rivet side braces that can not be riveted after installed. Have re-installed seat back. (This was a bear! )

As expected, I need to rivet a few things on fuse. that can't be done later. (Lots to rivet from bottom of plane.